Yara Pilbara Nitrates

Yara Pilbara NitratesYara is the operator of Yara Pilbara Nitrates Pty Ltd (YPNPL), a joint venture between Yara (55%) and Orica (45%).

YPNPL is in the process of constructing a technical ammonium nitrate (TAN) facility adjacent to Yara Pilbara’s existing liquid ammonia plant on the Burrup Peninsula. When commissioned the TAN Plant will be owned by Yara Pilbara Nitrates Pty Ltd, operated by Yara International ASA and marketed by Orica Mining Services Pilbara (OMSP), a joint venture operated by Orica. The product manufactured at the TAN plant will be distributed into the local Pilbara market by OMSP.

Compliance Assessment Reports MS870

TAN Plant MS870 Compliance Assessment Report 2012 (PDF, 1.76 MB)

TAN Plant MS870 Compliance Assessment Report 2013 (PDF, 51.2 MB)

TAN Plant MS870 Compliance Assessment Report 2014 (PDF, 1.16 MB)

TAN Plant MS870 Compliance Assessment Report 2015 (PDF, 31.3 MB)

TAN Plant MS870 Compliance Assessment Report 2016 (PDF, 24.9 MB)

TAN Plant MS870 Compliance Assessment Report 2017 (PDF, 36 MB)

Annual Environmental Compliance Reports EPBC 2008/4546

TAN Plant EPBC Annual Compliance Report 2014 (PDF, 13.2 MB)

TAN Plant EPBC Annual Compliance Report 2015 (PDF, 4.87 MB)

TAN Plant EPBC Annual Compliance Report 2016 (PDF, 3.5 MB)

TAN Plant EPBC Annual Compliance Report 2017 (PDF, 7.94 MB)

TAN Plant EPBC Annual Compliance Report 2017 – Addendum (PDF, 5 MB)

Air Monitoring Reports

Baseline Air Quality Monitoring Report 2017 (PDF, 1.3 MB)

Air Quality Monitoring Report - December 2017 (PDF, 160 KB)

Air Quality Monitoring Report - January 2018 (PDF, 148 KB)


Rock Art Monitoring Reports

Burrup Penninsula Aboriginal Petroglyphs Report 2004-2014 (PDF, 9.77 MB)

Heritage Monitoring Report 2014 (PDF, 2.87 MB)

Heritage Monitoring Report 2015 (PDF, 2.04 MB)

Burrup Peninsula Aboriginal Petroglyphs Report: Colour Change & Spectral Mineralogy 2004-2016 (PDF, 8.01MB)

Approved Monitoring and Management Plans

Construction Environmental Management Plan (PDF, 5.29 MB)

Aboriginal Heritage Management Plan (PDF, 903 KB)

Hazardous Materials Management Plan (PDF, 336 KB)

Emergency Response Management Plan (PDF, 416 KB)

Operational Environmental Management Plan (PDF, 4.33 MB)

Groundwater Monitoring Reports

Groundwater Monitoring Event – March/April 2013 (PDF, 3.65 MB)

Groundwater Monitoring Event - October 2013 (PDF, 3.01 MB)

Groundwater Monitoring Event - April 2014 (PDF, 3.06 MB)

Groundwater Monitoring Event - October 2014 (PDF, 8.19 MB)

Groundwater Monitoring Event – April 2015 (PDF, 1.03 MB)

Groundwater Monitoring Event – November 2015 (PDF, 1.24 MB)

Groundwater Monitoring Event - June 2016 (PDF, 270 KB)

Groundwater Monitoring Event - November 2016 (PDF, 114 KB)

Groundwater Monitoring Event - March 2017 (PDF, 952 KB)

Groundwater Monitoring Event - September 2017 (PDF, 490 KB)

Other Reports

TAN Plant EPBC 2008/4546 Approval Decision (PDF, 8.78 MB)

TAN Plant Ministerial Statement 870 (PDF, 1.04 MB)